# Demolition & cleanout job photos

Browse all 43 photographs of Sandlot’s demolition, flooring removal and debris work, with before-and-after views.

Source: https://sandlotdemoandjunk.com/photos
Last updated: 2026-11-02

# Our work.

Demolition, flooring removal and cleanouts, photographed on Sandlot jobs.

![Open condo floor plan after demolition with the kitchen wall opened up and the slab cleaned and cleared](https://sandlotdemoandjunk.com/media/job-08.webp)

![Condo kitchen before tear-out, with existing cabinets, curved counter and wood-look flooring](https://sandlotdemoandjunk.com/media/job-09.webp)

BEFOREAFTER

## Condo kitchen · before and after

Sandlot project · photos from different stages

All workDemoHaulClean

43 photographs of Sandlot’s demolition, flooring removal and debris work

 [![Living room with wall and ceiling finishes removed, exposed timber framing, a retained fireplace and a cleared floor](https://sandlotdemoandjunk.com/media/job-16.webp)](https://sandlotdemoandjunk.com/media/job-16.webp) 

Living room opened to framing01

 [![Wide view through an interior with exposed wall studs and ceiling joists above a cleared concrete floor](https://sandlotdemoandjunk.com/media/job-17.webp)](https://sandlotdemoandjunk.com/media/job-17.webp) 

Interior strip-out · exposed framing02

 [![Narrow bathroom with the shower removed and timber framing exposed at the far wall](https://sandlotdemoandjunk.com/media/job-18.webp)](https://sandlotdemoandjunk.com/media/job-18.webp) 

Bathroom tear-out · shower removed03

 [![Kitchen and dining area with cabinetry and flooring removed beneath a retained light fixture](https://sandlotdemoandjunk.com/media/job-19.webp)](https://sandlotdemoandjunk.com/media/job-19.webp) 

Kitchen & dining room · flooring removed04

 [![Hallway with the floor covering removed and adjoining walls and doorways retained](https://sandlotdemoandjunk.com/media/job-20.webp)](https://sandlotdemoandjunk.com/media/job-20.webp) 

Hallway · flooring removed05

 [![Bedroom with pink lower wall panels and a bare floor after the floor covering was removed](https://sandlotdemoandjunk.com/media/job-21.webp)](https://sandlotdemoandjunk.com/media/job-21.webp) 

Bedroom · flooring removed06

 [![Bathroom with fixtures removed, exposed wall framing and stripped flooring beneath retained vanity lights](https://sandlotdemoandjunk.com/media/job-22.webp)](https://sandlotdemoandjunk.com/media/job-22.webp) 

Bathroom · fixtures and finishes removed07

 [![Empty bedroom with bay windows and an exposed floor after removal of the floor covering](https://sandlotdemoandjunk.com/media/job-23.webp)](https://sandlotdemoandjunk.com/media/job-23.webp) 

Bedroom · exposed floor08

 [![Bathroom walls opened to timber studs with plumbing visible and demolition tools on the floor](https://sandlotdemoandjunk.com/media/job-24.webp)](https://sandlotdemoandjunk.com/media/job-24.webp) 

Bathroom walls · opened to framing09

 [![Shower area with wall tile removed, exposed backing and a drain visible in the stripped base](https://sandlotdemoandjunk.com/media/job-25.webp)](https://sandlotdemoandjunk.com/media/job-25.webp) 

Shower area · tile removed10

 [![Interior staircase with the floor covering removed from the treads and the wall handrail retained](https://sandlotdemoandjunk.com/media/job-26.webp)](https://sandlotdemoandjunk.com/media/job-26.webp) 

Stairway · floor covering removed11

 [![Room with the floor covering removed and the exposed floor cleared beneath a patched ceiling](https://sandlotdemoandjunk.com/media/job-27.webp)](https://sandlotdemoandjunk.com/media/job-27.webp) 

Room cleared after flooring removal12

 [![Hallway during demolition with ceiling framing exposed and removed material covering the floor](https://sandlotdemoandjunk.com/media/job-28.webp)](https://sandlotdemoandjunk.com/media/job-28.webp) 

Hallway demolition · debris stage13

 [![Hallway with exposed ceiling framing and a cleared floor extending through the room](https://sandlotdemoandjunk.com/media/job-29.webp)](https://sandlotdemoandjunk.com/media/job-29.webp) 

Hallway demolition · cleared stage14

 [![Kitchen during tear-out with removed wall and ceiling finishes and a pile of debris on the floor](https://sandlotdemoandjunk.com/media/job-30.webp)](https://sandlotdemoandjunk.com/media/job-30.webp) 

Kitchen tear-out · demolition debris15

 [![Kitchen after debris clearance with cabinetry removed and overhead framing still exposed](https://sandlotdemoandjunk.com/media/job-31.webp)](https://sandlotdemoandjunk.com/media/job-31.webp) 

Kitchen tear-out · floor cleared16

 [![Pile of bagged waste, removed timber and mixed remodel debris under a covered area](https://sandlotdemoandjunk.com/media/job-32.webp)](https://sandlotdemoandjunk.com/media/job-32.webp) 

Remodel debris · ready for loading17

 [![Interior room with wall finishes removed to expose timber framing and overhead ductwork](https://sandlotdemoandjunk.com/media/job-33.webp)](https://sandlotdemoandjunk.com/media/job-33.webp) 

Interior walls · selective strip-out18

 [![Lengths of timber stacked inside an open room beside other building materials](https://sandlotdemoandjunk.com/media/job-34.webp)](https://sandlotdemoandjunk.com/media/job-34.webp) 

Lumber stacked in the work area19

 [![Garage with broken masonry pieces staged on the floor and a debris container visible outside](https://sandlotdemoandjunk.com/media/job-35.webp)](https://sandlotdemoandjunk.com/media/job-35.webp) 

Garage · broken material staged for removal20

 [![Bathroom wall stripped to timber framing with plumbing and insulation visible above the bare floor](https://sandlotdemoandjunk.com/media/job-36.webp)](https://sandlotdemoandjunk.com/media/job-36.webp) 

Bathroom wall · finishes removed21

 [![Interior opened to exposed timber studs and ceiling joists above an existing timber floor](https://sandlotdemoandjunk.com/media/job-37.webp)](https://sandlotdemoandjunk.com/media/job-37.webp) 

Whole-room strip-out · timber floor22

 [![Bathroom during strip-out with exposed timber framing, plumbing and remaining tiled floor sections](https://sandlotdemoandjunk.com/media/job-38.webp)](https://sandlotdemoandjunk.com/media/job-38.webp) 

Bathroom strip-out · exposed services23

 [![Office corridor with the floor covering removed between retained doors and black wall trim](https://sandlotdemoandjunk.com/media/job-39.webp)](https://sandlotdemoandjunk.com/media/job-39.webp) 

Office corridor · flooring removed24

 [![Small office with a window and exposed flooring after the floor covering was removed](https://sandlotdemoandjunk.com/media/job-40.webp)](https://sandlotdemoandjunk.com/media/job-40.webp) 

Office room · flooring removed25

 [![Open office area with removed floor covering and the ceiling lights and glazing retained](https://sandlotdemoandjunk.com/media/job-41.webp)](https://sandlotdemoandjunk.com/media/job-41.webp) 

Open office · flooring removed26

 [![Long room during tile removal with broken floor tiles and removal tools visible](https://sandlotdemoandjunk.com/media/job-42.webp)](https://sandlotdemoandjunk.com/media/job-42.webp) 

Tile removal · work in progress27

 [![Bagged waste, timber and mixed remodel debris staged in a yard outside the building](https://sandlotdemoandjunk.com/media/job-43.webp)](https://sandlotdemoandjunk.com/media/job-43.webp) 

Outdoor remodel debris · staged for haul-off28

 [![Kitchen mid-demolition with soffit opened up, ductwork exposed, and tile and drywall debris covering the floor](https://sandlotdemoandjunk.com/media/job-01.webp)](https://sandlotdemoandjunk.com/media/job-01.webp) 

Kitchen tear-out · during29

 [![The same kitchen after debris removal, with a swept slab floor and only the framing and ductwork left in place](https://sandlotdemoandjunk.com/media/job-02.webp)](https://sandlotdemoandjunk.com/media/job-02.webp) 

Kitchen tear-out · cleared30

 [![Interior room with a large pile of broken tile and drywall stacked against the wall during demolition](https://sandlotdemoandjunk.com/media/job-03.webp)](https://sandlotdemoandjunk.com/media/job-03.webp) 

Tile & drywall · during31

 [![The same room cleared out and swept to bare slab after all demolition debris was hauled away](https://sandlotdemoandjunk.com/media/job-04.webp)](https://sandlotdemoandjunk.com/media/job-04.webp) 

Tile & drywall · cleared32

 [![Whole-house interior demolition down to open wood framing and exposed ceiling joists with a clean concrete slab](https://sandlotdemoandjunk.com/media/job-05.webp)](https://sandlotdemoandjunk.com/media/job-05.webp) 

Whole-home strip-out33

 [![Gutted living area taken to the studs with ductwork and wiring exposed overhead and the slab swept clean](https://sandlotdemoandjunk.com/media/job-06.webp)](https://sandlotdemoandjunk.com/media/job-06.webp) 

Framing & clean slab34

 [![Condo living room stripped of flooring and cabinetry, leaving bare concrete ready for the next trade](https://sandlotdemoandjunk.com/media/job-07.webp)](https://sandlotdemoandjunk.com/media/job-07.webp) 

Condo living room · after35

 [![Open condo floor plan after demolition with the kitchen wall opened up and the slab cleaned and cleared](https://sandlotdemoandjunk.com/media/job-08.webp)](https://sandlotdemoandjunk.com/media/job-08.webp) 

Condo kitchen · after36

 [![Condo kitchen before tear-out, with existing cabinets, curved counter and wood-look flooring](https://sandlotdemoandjunk.com/media/job-09.webp)](https://sandlotdemoandjunk.com/media/job-09.webp) 

Condo kitchen · before37

 [![Condo living room before flooring removal, with existing flooring, ceiling fan and balcony doorway](https://sandlotdemoandjunk.com/media/job-10.webp)](https://sandlotdemoandjunk.com/media/job-10.webp) 

Condo living room · before38

 [![Laundry closet with flooring and appliances removed, leaving bare subfloor and capped water lines](https://sandlotdemoandjunk.com/media/job-11.webp)](https://sandlotdemoandjunk.com/media/job-11.webp) 

Laundry flooring removed39

 [![Hallway and adjoining rooms stripped of carpet and baseboards down to bare subfloor](https://sandlotdemoandjunk.com/media/job-12.webp)](https://sandlotdemoandjunk.com/media/job-12.webp) 

Hallway flooring removed40

 [![Broken concrete patio slab busted up into a pile of rubble in a backyard ready for haul-off](https://sandlotdemoandjunk.com/media/job-13.webp)](https://sandlotdemoandjunk.com/media/job-13.webp) 

Concrete removal · during41

 [![Backyard graded down to bare dirt after demolition debris and vegetation were hauled off](https://sandlotdemoandjunk.com/media/job-14.webp)](https://sandlotdemoandjunk.com/media/job-14.webp) 

Backyard · cleared42

 [![Backyard with broken concrete, brick, and lumber debris piled up alongside a home addition, staged for haul-off](https://sandlotdemoandjunk.com/media/job-15.webp)](https://sandlotdemoandjunk.com/media/job-15.webp) 

Concrete & brick · during43

## Contact Sandlot

480-818-1449

info@sandlotdemoandjunk.com

Monday–Friday, 8am–6pm. Saturday: emergency service only; call to confirm availability. Sunday: closed.

[Request an estimate](https://sandlotdemoandjunk.com/contact). Sandlot confirms the price and appointment; submitting a request does not book a job.
